In this video, Ask This Old House general contractual worker Tom Silva uncovers the most ideal approaches to secure shingles to a rooftop.
Steps:
1. These venture rules are for low rooftops that permit simple get to, for example, those on yards, sheds, or doghouses. For bigger rooftops, procuring an expert material group with legitimate fall security is exhorted.
2. Line up aluminum trickle edge flush with the edge of the rooftop and make a pencil line at the top on each end of the house.
3. Utilizing the chalk line, snap a line between the two imprints to get a straight edge.
4. Draw the dribble edge down about a half-inch from that line to make a crevice between the trickle edge and the sash board.
5. Nail the dribble edge set up utilizing 1¼-inch electrifies material nails and a sledge.
6. Rehash ventures for gabled finishes, introducing the dribble edge up the rooftop along the peak.
7. Lay out 30-lb. black-top material felt paper and nail it set up utilizing 1¼-inch electrifies material nails.
8. To lay out the outline for the shingles, start at the base of the rooftop and place a measuring tape ½ inch from the edge of the rooftop to guarantee the shingles overhang the dribble edge.
9. Check 12 creeps up on the rooftop for the main course of shingles, at that point stamp each 5 inches as far as possible up the rooftop to set your uncover. Do this on both sides of the rooftop.
10. Utilizing the chalk line, snap a straight line on every 5-inch increase.
11. Utilize the chalk line to snap a straight line vertically every 6 inches.
12. Introduce a starter course by removing the three tabs on a shingle, leaving just the top tar area.
Steps:
1. These venture rules are for low rooftops that permit simple get to, for example, those on yards, sheds, or doghouses. For bigger rooftops, procuring an expert material group with legitimate fall security is exhorted.
2. Line up aluminum trickle edge flush with the edge of the rooftop and make a pencil line at the top on each end of the house.
3. Utilizing the chalk line, snap a line between the two imprints to get a straight edge.
4. Draw the dribble edge down about a half-inch from that line to make a crevice between the trickle edge and the sash board.
5. Nail the dribble edge set up utilizing 1¼-inch electrifies material nails and a sledge.
6. Rehash ventures for gabled finishes, introducing the dribble edge up the rooftop along the peak.
7. Lay out 30-lb. black-top material felt paper and nail it set up utilizing 1¼-inch electrifies material nails.
8. To lay out the outline for the shingles, start at the base of the rooftop and place a measuring tape ½ inch from the edge of the rooftop to guarantee the shingles overhang the dribble edge.
9. Check 12 creeps up on the rooftop for the main course of shingles, at that point stamp each 5 inches as far as possible up the rooftop to set your uncover. Do this on both sides of the rooftop.
10. Utilizing the chalk line, snap a straight line on every 5-inch increase.
11. Utilize the chalk line to snap a straight line vertically every 6 inches.
12. Introduce a starter course by removing the three tabs on a shingle, leaving just the top tar area.